Measure, price and run your projects — in one place.
QSpace takes a project from the drawings to the money: measure quantities in Takeoff, price them in Estimate, keep a separate Costing copy, send a Quote, and track receivables, payables and job cost in the ERP.
- Takeoff — Upload drawings, set the scale and measure counts, lengths and areas.
- Estimate — Price every row with rates or worksheets; folders total themselves.
- Quote — A clean client document built from your estimate.
- ERP — Invoices, payments, purchases and the cost of each BOQ item.
How the apps fit together
Takeoff and Estimate work on the same rows: a row you measure in Takeoff is the row you price in Estimate. A change in one shows up in the other within seconds, without a reload. Costing is a copy of an estimate that you can change on its own and re-sync when you want.
Projects
Every piece of work starts with a project.
- Create a project. On the dashboard, click New project and enter a name. Adding a location is optional.
- Open an app. Each project shows the apps it uses. Click one to open it, or use Add App to add another.
- Manage the project. From the project panel you can rename it, set its location, choose its apps and plan its milestones.
Sharing a project
Click Share to invite someone to your project. They will receive an invitation, which they can accept or decline from their notifications.
Archive and settings
Move projects you are no longer working on to the Archive. You can restore them at any time. In Settings you can change the appearance, switch between light and dark mode, and update your password.
Plans
What each plan includes.
| Plan | Includes |
|---|---|
| Free | Up to 2 projects, with Estimate, Takeoff (one drawing per project) and Quote (exporting not included). Using an organization promo code raises this to 4 projects. |
| Pro | Up to 10 projects. |
| Enterprise | Coming soon. |
Takeoff basics
Measure quantities directly from your drawings.
- Upload your drawing. Click Upload and choose a PDF or an image, then open it with Open document. If the PDF has several pages, you can move between them under Pages.
- Set the scale. Click Set Scale, click two points on a dimension you know, and type its real length. All measurements on that page will use this scale.
- Add your items. Build your list on the left with headings and items. You can drag items in from the Library or Master panel, or type your own.
- Measure. Click the + next to an item, choose a tool, and draw on the plan. The quantity is filled in for you.
Adding to or clearing a measurement
To measure more for the same item, click Continue next to it. To start an item again, right-click its drawing and choose Remove Element. This clears its measurements so you can measure it from the beginning.
Hiding drawings
Click the eye button next to an item to hide or show its drawings on the plan. The eye next to a heading hides or shows everything under it.
Measuring tools
Choose the tool that suits what you are measuring.
| Tool | Use it for |
|---|---|
| Count | Items you count, such as footings, doors or fittings. Each click adds one. |
| Length | Walls, beams, pipes and other runs. Hold S to draw straight lines. |
| Area | Slabs, floors, plastering and other surfaces. Draw around the outline and double-click to finish. |
| Perimeter | The distance around a shape. |
| Wall area | The area of a wall, from its length and height. |
Formulas
Each item can have a formula that turns the measurement into the final quantity. For example, [l]*2*2 multiplies the measured length by 2 and then by 2 again. You can add notes inside a formula, such as [c]*5ft high. Click the formula to edit it.
Ready-made tools
Under More tools you will find tools for common work such as concreting, formwork and reinforcement. They ask for a few sizes and calculate the quantity for you.
Units
Your item's unit stays the way you set it.
Measuring does not change the unit of an item. If you measure in a different unit, QSpace converts the measurement for you whenever it can.
- If the item has no unit yet, it takes the unit you measured in.
- To change an item's unit, choose a new one in its Unit column. Its rate is adjusted to match.
- Use Unit System to switch between metric and imperial units.
Library & Master panels
Reuse items instead of typing them again.
The Library is a ready-made collection of items with their rates. Master items lets you use items from another of your projects; choose the project with Select project. Drag an item from either panel into your list to add it, together with its rate breakdown.
Moving items with or without their headings
The button next to the search box decides what moves when you drag a heading. Choose Move with topics to move a heading with everything under it, or Move without topics to move only the item you drag.
Item numbers
Items can be numbered automatically (A, A.1, A.1.1 and so on) or you can type your own numbers. Use the switch in the Item column heading to choose.
Progress take-off
Measure the work completed on site.
Use the Progress take-off to record how much work has been done. Each item shows the quantity in the BOQ next to the quantity completed. Your original drawings appear faintly in the background, so you can trace over them easily.
The BOQ lock
Once progress measuring begins, the BOQ is locked so its quantities cannot be changed by mistake. The project owner can unlock it from Manage, or give selected people permission to edit it.
Estimate
Price your items and see the totals.
For each item you can enter the cost rate, gross rate, percentage and markup. Headings show the total of all the items under them, so your totals are always up to date.
- Use Markup or Set all percentages to apply a percentage to many items at once.
- Use Provisional Sum or Provisional Rate for items priced as allowances.
- Turn on Move rows when you want to rearrange items by dragging them.
- Use Global Variables to set values that many items can share.
Rate breakdowns
Build up a rate from materials, labour and plant.
Open an item's worksheet to work out its rate from the resources it needs, such as materials, labour, plant and subcontractors. The item's rate is the total of its worksheet.
To add a resource, choose it from the list. If it is not in the list yet, type its name and choose Add as a new resource.
Reports & export
View and share your BOQ in the way you need.
- View your BOQ Bill-Wise, Floor-Wise or Element Wise. Changing the view does not change your data.
- Use Reports for printable summaries, and Export to Excel to download your BOQ.
- Use Restore Backups to go back to an earlier version, or Import to open a backup file you saved.
Costing
A separate copy of your estimate.
Costing gives you your own copy of an estimate. You can change its rates and quantities without affecting the original, and update it from the estimate whenever you need to. Use Open Takeoff to see the measurements behind it.
Quote
The document your client receives.
Quote turns your estimate into a professional quotation with your company details. You can print, download or share it, and export it to Excel or import it from Excel to work on it in a spreadsheet. Exporting is available on paid plans.
ERP
Manage the money side of each project.
| Section | What you can do |
|---|---|
| Receivables | Send quotes and invoices, record payments you receive (with a printable receipt), and manage your customers. |
| Payables | Record purchases, expenses and subcontracts, and manage your suppliers. |
| Job cost | See the materials you have on hand and what each BOQ item has cost. |
| Accounting | View your chart of accounts. |
To record a payment, open Payments received, find the invoice by its number or the customer's name, and enter the amount paid.
Error codes
What a message's code means and what to do next.
When Qspace can't do something you asked, the message ends with a short code like QS-LIB-01. Click the code to come straight here. Quote it if you contact support.
Account & sign-in
| Code | What happened | What to do |
|---|---|---|
QS-ACC-01 | You were signed out because this account was opened on another device. | Sign in again. Only one device can use an account at a time. |
QS-ACC-02 | That username or email is already used by another account. | Pick a different username, or sign in if the account is yours. |
QS-ACC-03 | The current password is not correct. | Type your current password again. Use "Forgot password" on the sign-in page if needed. |
QS-ACC-04 | Your billing email is not verified yet. | Verify your billing email in Settings, then try again. |
Organizations
| Code | What happened | What to do |
|---|---|---|
QS-ORG-01 | An organization account cannot join another organization. | Use a personal account to join an organization. |
QS-ORG-02 | You are already in an organization. | Leave it first under Settings, Organization. |
QS-ORG-03 | You left an organization recently. | You can join another one 24 hours after leaving. |
QS-ORG-04 | No organization was found with that name. | Check the spelling of the organization name and try again. |
QS-ORG-05 | This organization has removed your access. | Ask the organization to unblock you. |
QS-ORG-06 | The promo code is not correct for this organization. | Ask the organization for its current promo code. |
QS-ORG-07 | Only the organization account can do this. | Ask your organization to make this change. |
QS-ORG-08 | Only an Organization account can start an organization. | Sign in with the organization account. |
QS-ORG-09 | Only a member of this organization can manage its library. | Add the person to the organization first. |
QS-ORG-10 | Another organization already uses that name. | Choose a different organization name. |
QS-ORG-11 | The organization has no name yet. | Set the organization name under Settings, General first. |
Libraries
| Code | What happened | What to do |
|---|---|---|
QS-LIB-01 | You do not have access to this library. | Ask your organization for access, or switch to a library you can use. |
QS-LIB-02 | The organization already has the most libraries allowed. | Rename or reuse an existing library instead. |
Projects
| Code | What happened | What to do |
|---|---|---|
QS-PRJ-01 | You have reached the project limit of your plan. | Delete projects you no longer need, or upgrade your plan. |
QS-PRJ-02 | Only the project owner can do this. | Ask the project owner to make this change. |
Documents
| Code | What happened | What to do |
|---|---|---|
QS-DOC-01 | Exporting documents needs a paid plan. | Upgrade to Pro to export documents. |
QS-DOC-02 | Only the project owner can issue documents. | Ask the project owner to issue it. |
QS-DOC-03 | This project already has the most documents your plan allows. | Remove a document first, or upgrade your plan. |
QS-DOC-04 | A file with that name already exists. | Rename the file and upload it again. |
Construction & progress
| Code | What happened | What to do |
|---|---|---|
QS-CON-01 | The project cannot move to that stage from here. | Move the project one stage at a time. |
QS-CON-02 | Construction has already started on this project. | Nothing to do. Continue from the Progress page. |
QS-CON-03 | Construction cannot start yet. | Fix the items listed in the message, then try again. |
QS-CON-04 | The BOQ is locked while progress is being measured. | The project owner can unlock it in Manage. |
QS-CON-05 | This progress entry follows the drawings. | Change the drawing instead of the entry. |
Takeoff & units
| Code | What happened | What to do |
|---|---|---|
QS-TKO-01 | Only a super administrator can use the Tool builder. | Ask a Qspace super administrator. |
QS-TKO-02 | A unit with this name already exists. | Use the existing unit, or pick another name. |
QS-TKO-03 | This is a built-in unit and cannot be changed. | Create your own unit instead. |
ERP
| Code | What happened | What to do |
|---|---|---|
QS-ERP-01 | This material is in stock. | Use "Issue to work" under Stock so it is costed at the average rate. |
Plans & payments
| Code | What happened | What to do |
|---|---|---|
QS-PAY-01 | Organization payments are not set up yet. | Try again later, or contact support. |
QS-PAY-02 | The payment could not be started. | Try again. If it keeps happening, contact support. |
QS-PAY-03 | This feature is not part of your plan. | Upgrade your plan to use it. |
Keyboard shortcuts
Work faster with these keys.
| Keys | What they do |
|---|---|
| Ctrl + Z | Undo |
| Ctrl + Y | Redo |
| Esc | Finish or cancel a drawing, or close a panel |
| S (hold) | Draw straight lines in Takeoff |
| Ctrl + mouse wheel | Zoom in and out |
| / | Search this documentation |
Saving your work
Your work is saved automatically.
- QSpace saves your changes as you work. You will see All changes saved when everything is stored.
- If you have Takeoff and Estimate open at the same time, changes in one appear in the other within a few seconds.
- Use Undo (Ctrl + Z) or Restore Backups to go back to earlier work.
Questions & answers
Quick answers to common questions.
Why can't I edit the BOQ?
The BOQ is locked because progress measuring has started. Ask the project owner to unlock it or to give you permission.
Why didn't my item's unit change when I measured it?
This is intentional. Measuring never changes an item's unit, so its rate stays correct.
Why can't I drag items?
Turn on Move rows in the toolbar. The drag handles then appear next to each item.
How do I hide a drawing?
Click the eye next to the item. Click it again to show the drawing. The eye next to a heading hides or shows everything under it.
A resource I need is not in the list. What do I do?
Type its name in the resource list and choose Add as a new resource. Fill in its unit and rate, and it is added to your project.
Need more help?
Click Help & Support on the dashboard after signing in, and our team will be happy to help.